In class, we had made a production schedule allowing us to know when we would do our filming, editing and adding sounds to complete our thriller opening. Below is a weekly schedule of what we plan to do and when we plan to do it.
Thriller Production Schedule:
—09/02/2012 – Equipment booked to collect in class at 1.15pm – Return 10/02/2012 at 9am.
—14/02/2012 – 20/02/2012 (Half Term) – Collect at 4pm and return at 9am.
—22/02/2012 – Check whether reshooting is required
—24/02/2012 – Begin editing if all filming is complete.
—29/02/2012 – Add sounds/music and complete editing
—02/03/2012 – Look over opening, see whether anything needs to be changed
—12/03/2012 – Thriller film and blog deadline.